DAY ONE
09.00 am – 4.30 pm
Introduction
- Introduction to basic concept
- Introduction to Navisworks interface
Introduction (cont)
- Export *.rvt files to *.nwc files format
- Append Navisworks file set
- Load Workspace
Design Review
- Introduction to Design Review
- Model Cross-Sectioning
- Saving Viewpoint
DAY TWO
09.00 am – 4.30 pm
Design Review (cont)
- Mark-up and add remarks/comments
- Model-measurement
Design Review Reports
- Exporting Design Review report
- Producing Design Review report
Clash Analysis
- Setup search set for Architecture model vs Plumbing model
DAY THREE
09.00 am – 4.30 pm
Clash Analysis (cont)
- Setup Clash Analysis list
Clash Analysis (Cont)
- Run Clash Analysis test
- Grouping Clash Analysis results
Clash Analysis Report
- Exporting Clash Analysis report
- Producing Clash Analysis report
DAY FOUR
09.00 am – 4.30 pm
Revision
Exam